Construction capability
What Tin Phat Cons brings to your project
Engineers, site managers and our own construction crews; a capability certificate issued by the Ho Chi Minh City Department of Construction; and the right equipment for each site, from hotels and offices to homes and factories.
01Sectors
Four types of projects we build
Each group lists projects we have delivered. Select a project to see its photos.

Hotels, offices & commercial
- Hotels and resorts
- Offices
- Showrooms, shops and restaurants
- Interior fit-out to shop drawings
Selected projects

Homes & villas
- Townhouses and detached homes
- Villas and garden houses
- Apartment interiors
- Renovating older homes
Selected projects

Factories & steel structures
- Factory foundations and concrete frames
- Steel truss fabrication and erection
- Re-roofing, parking sheds, warehouses
- Repairs while the plant keeps running

Sports, infrastructure & public works
- Sports halls and pickleball courts
- Basements and space-frame roofs
- Landscaping and internal roads
- Public works
02Technical capability
From drawings and estimates to acceptance
Design & estimating
Architects and engineers prepare the documents before work starts.
- Architectural and interior design (Grade III)
- Design review
- Interior shop drawings
- Estimates itemised by work package
Construction & management
Every project has a site manager on the ground full-time.
- Civil and industrial construction (Grade II)
- MEP, water supply and drainage (Grade II)
- Schedule committed in the contract
- Weekly progress report with photos
Quality & safety
Each work package is inspected with the owner and minuted.
- Construction supervision (Grade III)
- Certified welders and electricians
- Protection for buildings still in use
- Site cleared of surplus and waste at handover
03Organisation
How the company is organised
Seven departments under two Deputy Directors, one covering engineering and one covering business and operations. Every project has a named site manager, with engineers and supervisors involved from drawings through to acceptance.
Members' Council
Director
Deputy Director
Engineering — Projects
Engineering — Projects
- Site manager
- Site engineer / Supervisor
- Site crew / Foreman
- Workers
Design — QS / Estimating
- Design / BIM
- Quantity take-off
- Estimating / Final accounts
Accounting — Finance
- Accounting
- Receivables
- Treasury
Deputy Director
Business — Operations
Sales — Tendering
- Tendering
- Capability profile
- Client relations
Administration — HR
- Recruitment
- C&B
- Administration
Procurement — Materials — Equipment
- Purchasing
- Warehouse
- Plant & equipment
Safety — Quality
HSSE / QC
- HSE
- QA / QC
04Plant & equipment
Plant and equipment on site
Photos taken by our crews on site. Select a group to view the photos.
05How we work
A 6-step process, from site survey to warranty
At every stage the owner knows what is being done, how much time remains and what has already been paid. We operate under Construction Capability Certificate No. HCM-00066695, issued by the Ho Chi Minh City Department of Construction.
Site survey and brief
Our engineers visit the site to measure, record the existing condition and discuss use, budget and timeline. We quote only after seeing the site in person.
A plan that fits your operations
For hotels and offices that remain open, or plants that keep producing, work zones, working hours and protection measures are agreed with management in advance. Work starts only once the plan is approved.
Itemised estimate and contractual schedule
Quantities and unit rates are broken down per work package. Milestones, payment stages and acceptance criteria are set out in writing, and any later change requires the owner's confirmation.
Construction under a licensed site manager
A certified site manager stays on site throughout. Safety measures follow current regulations and each building's or plant's own rules. The owner receives a weekly progress report with photos.
Joint acceptance and clean handover
Each work package is inspected with the owner and minuted. Outstanding items are fixed before handover, and surplus materials and waste are cleared from site.
Warranty and after-handover support
Warranty terms are set per work package in the contract. After the warranty period ends we still respond: our technicians inspect first, before any discussion of cost.
06Certificates & licences
Legal documents and capability certificates
Full copies are included in our capability profile and sent with every quotation.
Enterprise registration certificate
Enterprise code 0315214083 · established in 2018
Construction Capability Certificate
No. HCM-00066695 · issued by the Ho Chi Minh City Department of Construction
- Civil and industrial building constructionGrade II
- Mechanical, electrical, water supply & drainage installationGrade II
- Technical infrastructure, roads and bridges, irrigation and dyke worksGrade III
- Design and design verification of civil and industrial buildingsGrade III
- Construction supervision of civil and industrial worksGrade III
Individual practising certificates
Site manager and construction supervision
Trade certificates
Welding and electrical, held by the workers on site
Team qualifications
Architects, engineers and a master of engineering

Looking for a contractor for your next project?
Send us drawings or photos of the current condition. We survey on site and send a plan with an estimate within 24 working hours.