Construction capability

What Tin Phat Cons brings to your project

Engineers, site managers and our own construction crews; a capability certificate issued by the Ho Chi Minh City Department of Construction; and the right equipment for each site, from hotels and offices to homes and factories.

01Sectors

Four types of projects we build

Each group lists projects we have delivered. Select a project to see its photos.

02Technical capability

From drawings and estimates to acceptance

  1. Design & estimating

    Architects and engineers prepare the documents before work starts.

    • Architectural and interior design (Grade III)
    • Design review
    • Interior shop drawings
    • Estimates itemised by work package
  2. Construction & management

    Every project has a site manager on the ground full-time.

    • Civil and industrial construction (Grade II)
    • MEP, water supply and drainage (Grade II)
    • Schedule committed in the contract
    • Weekly progress report with photos
  3. Quality & safety

    Each work package is inspected with the owner and minuted.

    • Construction supervision (Grade III)
    • Certified welders and electricians
    • Protection for buildings still in use
    • Site cleared of surplus and waste at handover

03Organisation

How the company is organised

Seven departments under two Deputy Directors, one covering engineering and one covering business and operations. Every project has a named site manager, with engineers and supervisors involved from drawings through to acceptance.

Members' Council

Director

Deputy Director

Engineering — Projects

  • Engineering — Projects

    • Site manager
    • Site engineer / Supervisor
    • Site crew / Foreman
    • Workers
  • Design — QS / Estimating

    • Design / BIM
    • Quantity take-off
    • Estimating / Final accounts
  • Accounting — Finance

    • Accounting
    • Receivables
    • Treasury

Deputy Director

Business — Operations

  • Sales — Tendering

    • Tendering
    • Capability profile
    • Client relations
  • Administration — HR

    • Recruitment
    • C&B
    • Administration
  • Procurement — Materials — Equipment

    • Purchasing
    • Warehouse
    • Plant & equipment
  • Safety — Quality

    HSSE / QC

    • HSE
    • QA / QC

04Plant & equipment

Plant and equipment on site

Photos taken by our crews on site. Select a group to view the photos.

05How we work

A 6-step process, from site survey to warranty

At every stage the owner knows what is being done, how much time remains and what has already been paid. We operate under Construction Capability Certificate No. HCM-00066695, issued by the Ho Chi Minh City Department of Construction.

  1. Site survey and brief

    Our engineers visit the site to measure, record the existing condition and discuss use, budget and timeline. We quote only after seeing the site in person.

  2. A plan that fits your operations

    For hotels and offices that remain open, or plants that keep producing, work zones, working hours and protection measures are agreed with management in advance. Work starts only once the plan is approved.

  3. Itemised estimate and contractual schedule

    Quantities and unit rates are broken down per work package. Milestones, payment stages and acceptance criteria are set out in writing, and any later change requires the owner's confirmation.

  4. Construction under a licensed site manager

    A certified site manager stays on site throughout. Safety measures follow current regulations and each building's or plant's own rules. The owner receives a weekly progress report with photos.

  5. Joint acceptance and clean handover

    Each work package is inspected with the owner and minuted. Outstanding items are fixed before handover, and surplus materials and waste are cleared from site.

  6. Warranty and after-handover support

    Warranty terms are set per work package in the contract. After the warranty period ends we still respond: our technicians inspect first, before any discussion of cost.

06Certificates & licences

Legal documents and capability certificates

Full copies are included in our capability profile and sent with every quotation.

  • Enterprise registration certificate

    Enterprise code 0315214083 · established in 2018

  • Construction Capability Certificate

    No. HCM-00066695 · issued by the Ho Chi Minh City Department of Construction

    • Civil and industrial building constructionGrade II
    • Mechanical, electrical, water supply & drainage installationGrade II
    • Technical infrastructure, roads and bridges, irrigation and dyke worksGrade III
    • Design and design verification of civil and industrial buildingsGrade III
    • Construction supervision of civil and industrial worksGrade III
  • Individual practising certificates

    Site manager and construction supervision

  • Trade certificates

    Welding and electrical, held by the workers on site

  • Team qualifications

    Architects, engineers and a master of engineering

Looking for a contractor for your next project?

Send us drawings or photos of the current condition. We survey on site and send a plan with an estimate within 24 working hours.

View projects